Leroy Center-Mayfield Q1 and Q2 138-kV Transmission Lines (Phase 2) project (OPSB Case No. 24-2383-EL-BLN)
In this project, ATSI is proposing to reconductor an approximately 7.3-mile segment of the existing 15.7-mile double-circuit Leroy Center-Mayfield Q1 and Q2 138-kV transmission lines, extending from Structure 7056 (Pawnee Tap) to the Mayfield Substation. The project will encompass replacing the existing 4/0 AWG 7 strand copper conductor with 336.4-kcmil 26/7 ACSS conductor. The project scope will not include any replacement of structures. The project is in the existing transmission corridor in Chardon, Munson and Chester townships in Geauga County, Ohio.
Project Documents
A paper copy of the application can be supplied within five business days upon request at no more than the cost of printing and shipping. A request for a paper copy can be made by contacting the transmission project hotline at 1 888-311-4737 or by email. Please reference the project name and case number (24-2383-EL-BLN) in all communications.