Lakeview-Ottawa 138-kV Line Reconductor (Case No. 22-0967-EL-BLN)
In this Project, ATSI is proposing to reconductor two sections of the existing Lakeview-Ottawa 138 kV Transmission Line. The first section begins at Lakeview Substation and proceeds approximately 7.6 miles to an existing steel lattice tower located on the eastern side of the Little Portage River. As part of reconductoring this section, ATSI will replace five existing steel lattice towers with new steel monopoles. The second section consists of reconductoring the last span of line (approximately 160 feet) into Ottawa Substation. ATSI will replace the existing steel lattice tower located outside and east of Ottawa Substation with a new steel monopole. The project is needed to resolve NERC, PJM, and FE planning criteria violations identified by PJM under RTEP baseline project (b3033). The Project is located in the City of Port Clinton, Portage Township, Salem Township, and Bay Township in Ottawa County.
Project Documents
A paper copy of the application can be supplied within 5 business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1‑888-311-4737 or by e-mail. Please reference the project name and case number (22-0967-EL-BLN) in all communications.