Galion-Roberts South 138-kV Transmission Line Loop to Selma Project (Case No. 24-0668-EL-BNR)

In this project, ATSI is proposing to construct an approximately 235-foot long 138-kV transmission line loop from the existing Galion-Roberts South 138-kV Transmission Line to the new Selma Substation. The Selma Substation is currently under construction by Marion County Solar Project, LLC and was approved and certificated in OPSB Case No. 21-0036-EL-BGN. The project is located in Marion Township, Marion County, Ohio.

Project Documents

A paper copy of the application can be supplied within five business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1‑888-311-4737 or by e-mail. Please reference the project name and case number (24-0668-EL-BNR) in all communications.