Sutton Substation Equipment Replacement Project

Monongahela Power Transmission Planning has identified transmission substation protection schemes that are using a certain vintage of substation electromechanical relays and communication equipment that have a history of misoperation at the Sutton Substation. FirstEnergy’s standards call for enhancement of fault protection to reduce relay misoperations, reduce the number of transmission system elements removed from service during a fault and increase the availability of transmission system elements. The required equipment upgrades that need to be made at the Sutton Substation include:

  • Foundations, conduit and grounding for new equipment
  • Three 138-kV surge arresters
  • One 138-kV CVT
  • One 138-kV Wave trap and line tuner

Construction of the project is expected to commence on or about April 2, 2024, and be complete on or about October 18, 2024.  

Project Documents

A paper copy of the application can be supplied within 5 business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1-800-589-2837 or by email. The project name should be referenced in all communications.