Talmadge Substation Expansion Project Case No. 24-0037-EL-BLN
In this project, ATSI is proposing to expand the existing Talmadge 138-kV Substation to facilitate the installation of a four (4) breaker ring bus. The existing square footage of the Talmadge Substation will expand by approximately 193 percent to facilitate the installation of new equipment. This project will also involve the installation of two (2) new structures outside of the Talmadge Substation. The new structures are needed to support the redesigned line exits out of the Talmadge Substation. The project is located in Sylvania Township in Lucas County, Ohio.
Project Documents
A paper copy of the application can be supplied within 5 business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1-800-589-2837 or by e-mail. The project name and Case Number (24-0037-EL-BLN) should be referenced in all communications.