Levis Park-Midway 138 kV Transmission Line Switch Replacement Project (OPSB Case No. 24-0905-EL-BNR)
In this project, American Transmission Systems, Incorporated (“ATSI”), a FirstEnergy company, proposes to replace an existing switch on the existing Levis Park-Midway 138-kV Transmission Line, replace an existing switch on the existing Levis Park-Midway 138 kV Transmission Line, with a new, single-circuit steel three-pole switch structure on concrete foundations. The existing switch structure is a three-pole wood structure with guy wires and anchors that will be removed as part of the project. The new structure will be located on the same centerline, approximately 80’ northeast from the existing structure OM-99. The conductor and shield wire will be transferred to the new structure. The project is in the City of Waterville, Lucas County, Ohio.
Project Documents
A paper copy of the application can be supplied within five business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1 888-311-4737 or by email. Please reference the project name and case number (24-0905-EL-BNR) in all communications.