Leroy Center-Mayfield Q3 and Q4 138-kV Transmission Lines Reconductor Project, OPSB Case No. 23-0462-EL-BLN
In this Project, ATSI is proposing to replace the existing conductor on the 15.8-mile-long double-circuit Leroy Center-Mayfield Q3 and Q4 138 kV transmission lines, from Leroy Center Substation to Mayfield Substation. The existing 4/0 AWG 7 Strand Copper conductor will be replaced with 336.4 kcmil 26/7 ACSS conductor. The Project is located within an existing transmission corridor in Leroy Township, Lake County; and in Hambden, Chardon, Munson and Chester Townships in Geauga County, Ohio.
Project Documents
- Letter of Notification filed with the Ohio Power Siting Board
- Wetland Delineation Report filed with the Ohio Power Siting Board (Leroy Center-Pawnee Tap)
- Wetland Delineation Report filed with the Ohio Power Siting Board (Pawnee Tap-Mayfield)
A paper copy of the application can be supplied within 5 business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1‑888-311-4737 or by e-mail. Please reference the project name and case number (23-0462-EL-BLN) in all communications.