Knox-Nottingham 138-kV Transmission Line Rebuild Project - New Stacy BUC to Nottingham Sub Segment (Case No. 23-1013-EL-BLN)
In this Project, ATSI proposes to rebuild the New Stacy BUC-Nottingham Substation segment (approximately 10 miles long) of the approximately 44-mile Knox-Nottingham 138 kV Transmission Line and an approximately 3.6 mile segment of the Nottingham-Yager 138 kV Transmission Line that is immediately adjacent to the Knox-Nottingham 138 kV Transmission Line (“Project”). The New Stacy BUC-Nottingham Segment extends from existing structure 276, the point of interconnection with Buckeye Power, to existing structure 15922 (new structure 210) in Harrison County. The approximate 3.6-mile section of the Nottingham-Yager 138 kV Transmission Line extends from existing structure 3292, a conjunction of multiple transmission lines, to existing structure 3268, adjacent to Nottingham Substation. The Project will traverse Archer, Cadiz and Athens Townships in Harrison County, Ohio.
Project Documents
A paper copy of the application can be supplied within 5 business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1‑888-311-4737 or by e-mail. Please reference the project name and case number (23-1013-EL-BLN) in all communications.