Knox-Nottingham 138-kV Transmission Line Rebuild Project - Kilgore (Polo Road) to Washington Sub Segment (Case No. 24-0646-EL-BLN)
In this Project, ATSI proposes to rebuild the Kilgore (Polo Road)-Washington Sub Segment (approximately 11.3 miles long) of the approximately 44-mile Knox-Nottingham 138 kV Transmission Line. The Kilgore (Polo Road)-Washington Sub Segment extends from existing structure 332, the point of interconnection with American Electric Power (“AEP”), to existing structure 2861 (new structure 405) the point of interconnection with Carroll Electric Cooperative. The Project will traverse Perry, Lee, Center and Washington Townships in Carroll County, Ohio.
Project Documents
A paper copy of the application can be supplied within five business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1 888-311-4737 or by e-mail. Please reference the project name and case number (24-0646-EL-BLN) in all communications.