Holloway-Knox 138-kV Transmission Line Rebuild Project – Holloway Sub to Nottingham Sub Segment
ATSI will rebuild the approximately 20-mile-long Holloway-Nottingham #1 138kV and Holloway- Nottingham #2 138kV transmission lines. The rebuild will convert the existing single-circuit Holloway-Nottingham #1 138 kV and #2 138 kV transmission lines into a double circuit 138 kV transmission line utilizing steel double-circuit monopole structures, with a centerline midway between the two existing circuit alignments. The Project will traverse the City of St. Clairsville, Richland Township, Mead Township, Pultney Township, and Wheeling Township in Belmont County and Athens Township, Harrison County, Ohio.
Project Documents
A paper copy of the application can be supplied within 5 business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1-800-589-2837 or by e-mail. Please reference the project name and case number (23-0141-EL-BLN) in all communications.