Dowling-Optimus 138 kV No. 1 and No. 2 Transmission Lines Project (OPSB Case No. 25-0040-EL-BNR)
In this Project, ATSI and The Toledo Edison Company are proposing to construct (2) new 138 kV transmission lines, approximately 0.7 mile each, from the existing Dowling Substation to a new customer substation, which will be named Optimus Substation. The Project will require installation of total twenty-three (23) steel structures on concrete foundations, 12 structures for the Dowling-Optimus 138 kV No 1 Transmission Line and 11 structures for the Dowling-Optimus 138 kV No. 2 Transmission Line. The average structure height will be approximately 75 feet above ground. The Project is in Middleton Township, Wood County, Ohio.
Project Documents
A paper copy of the application can be supplied within five business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1-888-311-4737 or by email. Please reference the project name and case number (25-0040-EL-BNR) in all communications.