Chamberlain-West Akron 138-kV Transmission Line Switch Replacement Project. Case No. 24-0079-EL-BLN
In this project, American Transmission Systems, Incorporated (“ATSI”), a FirstEnergy company, is proposing to replace two (2) existing switches on the Chamberlain-West Akron 138-kV Transmission Line, immediately adjacent to the Nordonia Substation. Switches A-257 and A-261 are currently located on the same existing structure #12357. To facilitate the replacement of the existing switches, one (1) existing structure (#12357) and approximately 450 feet of existing conductor will be removed. the switches will be relocated and the new proposed alignment in to the Nordonia Substation will be supported on a total of four (4) new structures. The project will be located in the City of Macedonia, Summit County, Ohio.
Project Documents
A paper copy of the application can be supplied within 5 business days upon request at no more than the cost or printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1-800-589-2837 or by email. The project name and Case Number (24-0079-EL-BLN) should be referenced in all communications.