Broadview-Tangy 138 kV Transmission Line Switch Replacement Project (Case No. 23-0829-EL-BNR)
In this Project, ATSI proposes to replace two existing transmission line switches with two auto-sectionalizing switches on the Broadview–Tangy 138 kV Transmission Line at the 138 kV transmission line tap to Bellepoint Substation. The new auto-sectionalizing switches will reduce customer exposure to outages, improve restoration time, and improve operational flexibility. The Project is located in Concord Township, Delaware County, Ohio.
Project Documents
A paper copy of the application can be supplied within 5 business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1-800-589-2837 or by email. The project name and Case Number (23-0829-EL-BNR) should be referenced in all communications.