Highland-GM 138 kV Transmission Line Loop to Magellan Substation Project (Case No. 20-1176-EL-BLN)

In this project, ATSI is proposing to construct the new 138-kV 11-breaker breaker-and-a-half (future 12 breaker) Magellan Substation, which will be approximately 106,250 square feet in size. The project also proposes an approximately 0.5-mile long 138-kV transmission line loop connecting the new Magellan Substation to the Highland-GM 138-kV transmission line. The Magellan Substation will serve a new ATSI customer, Ultium Cells LLC, and improve reliability in the area of the Project. The project is located in the Village of Lordstown, Trumbull County, Ohio.

Project Documents

A paper copy of the application can be supplied within 5 business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1-800-589-2837 or by e-mail. Please reference the project name and case number (20-1176-EL-BLN) in all communications.